Find out more

Contact Barwon Coast at the following

(03) 5254 1118

Get In Touch

 

Notice to Mariners No. 135(T)-25

Published on 6 March 2025

 


Barwon River Boating Channel – South of Barwon Heads Channel Safety Realignment – Stage 1 Barge Towage and Beacon Installation Operations – Barwon River Mouth

Date: Effective from 11 March 2025

Details:
Mariners are advised that barge towage and beacon installation operations will take
place in the Barwon Heads river mouth south of the Barwon Heads pedestrian bridge
from 11 March 2025 for a period of approximately 4 weeks. Work barge GEMINAE
UVI1461535, 6.4m length x 3.2m beam will be used for beacon installation operations
with high powered vessels up to 8m conducting towage operations.

Approximate positions of the work barge are as follows (WGS84):
1.Starboard Buoy No.1
2.Port Buoy No.2

38°17.106’S 144°30.008’E (Fl.G.4s)
38°17.120’S 144°30.004’E (Fl.R.4s)

Mariners are advised to navigate with extreme caution in the vicinity of the Barwon Heads river
mouth boating channel during daylight hours from 11 March 2025. Mariners should consider
completely avoiding this area during these times.


SEE FULL DETAILS

Related Articles

Looking for summer work? Join our team by the coast

Barwon Coast is recruiting at least 15 Casual Cleaning Officers to join our caravan park and campground team for the busy 2026-27 peak season.

Read Article

Barwon Heads Nature Festival returns this September

The Barwon Heads Nature Festival is back from Monday 21 to Friday 25 September

Read Article

New Hooded Plover nest at Thirteenth Beach

A new Hooded Plvoer nest has been discovered on 13th Beach

Read Article

Have your say on draft playground designs for Barwon Heads Caravan Park

Barwon Coast is inviting the community to help shape the designs of two playgrounds at Barwon Heads Caravan Park,

Read Article