Find out more

Contact Barwon Coast at the following

(03) 5254 1118

Get In Touch

 

Notice to Mariners No. 135(T)-25

Published on 6 March 2025

 


Barwon River Boating Channel – South of Barwon Heads Channel Safety Realignment – Stage 1 Barge Towage and Beacon Installation Operations – Barwon River Mouth

Date: Effective from 11 March 2025

Details:
Mariners are advised that barge towage and beacon installation operations will take
place in the Barwon Heads river mouth south of the Barwon Heads pedestrian bridge
from 11 March 2025 for a period of approximately 4 weeks. Work barge GEMINAE
UVI1461535, 6.4m length x 3.2m beam will be used for beacon installation operations
with high powered vessels up to 8m conducting towage operations.

Approximate positions of the work barge are as follows (WGS84):
1.Starboard Buoy No.1
2.Port Buoy No.2

38°17.106’S 144°30.008’E (Fl.G.4s)
38°17.120’S 144°30.004’E (Fl.R.4s)

Mariners are advised to navigate with extreme caution in the vicinity of the Barwon Heads river
mouth boating channel during daylight hours from 11 March 2025. Mariners should consider
completely avoiding this area during these times.


SEE FULL DETAILS

Related Articles

2025-26 Annual Report released

Our 2025-26 Annual Report is now available online.

Read Article

New Barwon Heads cabins officially launched

An update on construction activities at Barwon Heads Caravan Park

Read Article

Notice to Mariners No. 415 – 2026

Barwon Heads – Barwon River Bar Depths Compromised

Read Article

Update on Surf Bridge North and South beach access tracks

We continue to closely monitor conditions at the Surf Bridge North and Surf Bridge Southbeach access tracks at RAAFs Beach.

Read Article