Find out more

Contact Barwon Coast at the following

(03) 5254 1118

Get In Touch

 

Notice to Mariners No. 135(T)-25

Published on 6 March 2025

 


Barwon River Boating Channel – South of Barwon Heads Channel Safety Realignment – Stage 1 Barge Towage and Beacon Installation Operations – Barwon River Mouth

Date: Effective from 11 March 2025

Details:
Mariners are advised that barge towage and beacon installation operations will take
place in the Barwon Heads river mouth south of the Barwon Heads pedestrian bridge
from 11 March 2025 for a period of approximately 4 weeks. Work barge GEMINAE
UVI1461535, 6.4m length x 3.2m beam will be used for beacon installation operations
with high powered vessels up to 8m conducting towage operations.

Approximate positions of the work barge are as follows (WGS84):
1.Starboard Buoy No.1
2.Port Buoy No.2

38°17.106’S 144°30.008’E (Fl.G.4s)
38°17.120’S 144°30.004’E (Fl.R.4s)

Mariners are advised to navigate with extreme caution in the vicinity of the Barwon Heads river
mouth boating channel during daylight hours from 11 March 2025. Mariners should consider
completely avoiding this area during these times.


SEE FULL DETAILS

Related Articles

Hooded Plover update – two active nests

Two nests have failed and two remain along our coastline.

Read Article

Summer food vendor expressions of interest 2026–27

Expressions of interest are now open for temporary summer food vendor permits across Barwon Coast Caravan Parks from 19 December 2026 to 31 January 2027.

Read Article

Hooded Plover update – two new nests at Thirteenth Beach

Great news for Hooded Plovers, with two new nests identified at Thirteenth Beach

Read Article

Temporary parking changes at Lahey Square – Wedsnesday 14 October

Filming for a car commercial is taking place in Barwon Heads on Wednesday 14 October.

Read Article