Find out more

Contact Barwon Coast at the following

(03) 5254 1118

Get In Touch

 

Notice to Mariners No.250(T) – 2024

Published on 17 June 2024

 


Barwon Heads – Barwon River Boating Channel-South of Barwon Heads
Channel Safety Realignment – Stage 1
Barge Towage and Beacon Piling Operations – Barwon River Mouth

Date: Effective from 18 June 2024

Details:

Mariners are advised that barge towage and beacon piling operations will take place in the Barwon Heads river mouth south of the Barwon Heads pedestrian bridge between Tuesday 18 June 2024 and Wednesday 19 June 2024. Towage vessels ‘Mundu’ (15.3m), ‘Valerie May’ (6.5m) and piling barge ‘Jack Daniel’ (19m x 8m) will be used for these operations.


Approximate positions of the piling barge are as follows (WGS84):
1.Starboard Buoy No.1 38°17.106’S 144°30.008’E
2.Port Buoy No.2 38°17.120’S 144°30.004’E
3.Starboard Buoy No.7 38°17.054’S 144°29.785’E


Mariners are advised to navigate with extreme caution in the vicinity of the Barwon Heads river mouth boating channel during daylight hours on Tuesday 18th June and Wednesday 19th June 2024.
Mariners should also consider completely avoiding this area during these dates.

SEE FULL DETAILS

Related Articles

Looking for summer work? Join our team by the coast

Barwon Coast is recruiting at least 15 Casual Cleaning Officers to join our caravan park and campground team for the busy 2026-27 peak season.

Read Article

Barwon Heads Nature Festival returns this September

The Barwon Heads Nature Festival is back from Monday 21 to Friday 25 September

Read Article

New Hooded Plover nest at Thirteenth Beach

A new Hooded Plvoer nest has been discovered on 13th Beach

Read Article

Have your say on draft playground designs for Barwon Heads Caravan Park

Barwon Coast is inviting the community to help shape the designs of two playgrounds at Barwon Heads Caravan Park,

Read Article