Barwon Heads – Barwon River Boating Channel-South of Barwon Heads
Channel Safety Realignment – Stage 1
Barge Towage and Beacon Piling Operations – Barwon River Mouth – Completed
New Starboard Hand Beacon Installed
Date: Effective from 18 June 2024
Details:
Mariners are advised that barge towage and beacon piling operations in the Barwon Heads river mouth south of the Barwon Heads pedestrian bridge have now been completed.
A new Starboard Beacon has been installed in the following approximate position (WGS84) and the following light characteristics:
1.Starboard Buoy No.7 38°17.054’S 144°29.785’E Green (Fl.G.4s)
See attached plan for further details.