Find out more

Contact Barwon Coast at the following

(03) 5254 1118

Get In Touch

 

Notice to Mariners No.259(T) – 2024

Published on 19 June 2024

 


Barwon Heads – Barwon River Boating Channel-South of Barwon Heads

Channel Safety Realignment – Stage 1

Barge Towage and Beacon Piling Operations – Barwon River Mouth – Completed

New Starboard Hand Beacon Installed

Date: Effective from 18 June 2024

Details:

Mariners are advised that barge towage and beacon piling operations in the Barwon Heads river mouth south of the Barwon Heads pedestrian bridge have now been completed.

A new Starboard Beacon has been installed in the following approximate position (WGS84) and the following light characteristics:

1.Starboard Buoy No.7 38°17.054’S 144°29.785’E Green (Fl.G.4s)

See attached plan for further details.

SEE FULL DETAILS

Related Articles

2025-26 Annual Report released

Our 2025-26 Annual Report is now available online.

Read Article

New Barwon Heads cabins officially launched

An update on construction activities at Barwon Heads Caravan Park

Read Article

Notice to Mariners No. 415 – 2026

Barwon Heads – Barwon River Bar Depths Compromised

Read Article

Update on Surf Bridge North and South beach access tracks

We continue to closely monitor conditions at the Surf Bridge North and Surf Bridge Southbeach access tracks at RAAFs Beach.

Read Article