Find out more
Contact Barwon Coast at the following
11 November 2026
Expressions of interest are now open for temporary summer food vendor permits across Barwon Coast Caravan Parks from 19 December 2026 to 31 January 2027.
9 November 2026
Three chicks thriving and a new nest
5 November 2026
Three chicks have hatched at Barwon Bluff South
3 November 2026
Two nests have failed and two remain along our coastline.
3 November 2026
Barwon Coast has launched its new Foreshore Master Plan, setting a shared direction for the management of 22 kilometres of coastline over the next 15 years.
Home / Recent Projects / Barwon Heads Caravan Park playground upgrade design
Community consultation 100%
Review and analyse feedback 10%
Share consultation findings and final design 0%
Construction of the playground west of the courts 0%
Construction of the playground near amenities block T4 0%
Construction of play space east of courts (around basketball ring) 0%
Published on 19 August 2026
Barwon Coast will be upgrading the two playgrounds at Barwon Heads Caravan Park as part of our commitment to providing safe, welcoming and enjoyable facilities for park guests and visitors. Between 19 August and 9 September we invited campers, guests, permit holders and the wider community to review the proposed playground designs and tell us what they think.
The existing playgrounds have reached the end of their useful life and require updating to meet modern safety, accessibility and operational standards. Playground upgrades are priority actions from the 10-year Caravan and Camping Parks Master Plan, which was finalised in 2023 following consultation with campers, community members and other stakeholders.
The play space surrounding the netball and tennis courts will be delivered in stages. Stage 1 will deliver the new playground on the western side of the netball and tennis courts alongside the Barwon Heads Football and Netball Club redevelopment (late 2026). Stage 2 will complete the play space on the eastern side of the netball and tennis courts (the area around the basketball ring); timing for this stage is yet to be confirmed. The second playground, co-located with amenities block T4, is expected to be delivered in late 2027. You can see the playground locations below.
Consultation on the proposed Barwon Heads Caravan Park playground designs has now closed.
Thank you to everyone who took the time to review the designs and share their feedback. We received five survey responses, while more than 30 people viewed the concept designs displayed at the Barwon Heads Caravan Park office. We are now reviewing all feedback alongside technical, accessibility, safety, operational and budget considerations to help inform the final designs.
We’ll share a further update as the project progresses.

Three important projects are being delivered at Barwon Heads Caravan Park during the second half of 2026:
Coordinating the upgrade of the western playground with the Barwon Heads Football and Netball Club redevelopment will minimise disruption to caravan park guests by avoiding multiple periods of construction activity in the same area. It will also help create a more connected, welcoming and functional space for families, park guests, sporting clubs and the wider community.
The second playground, located alongside amenities block T4, is expected to be upgraded in late 2027. The proposed design includes an accessible play element, a larger play area and stronger integration with the surrounding natural landscape to create a more inclusive and enjoyable space for families.
Feedback received during this consultation will help us refine the final design before it is finalised. Further information about the timing and delivery of the T4 playground will be shared as planning progresses.
The playground designs will provide opportunities for cultural signage and interpretation to be added in the future.
This would be developed in collaboration with Wadawurrung Traditional Owners to share stories of Country and help deepen visitors’ connection to place. You can see examples of how this has been done previously at Riverview Family Caravan Park and Breamlea Caravan Park.
All feedback is being carefully considered alongside accessibility, safety, technical, operational, site and budget requirements. While it may not be possible to incorporate every suggestion, the feedback will help us understand community priorities and refine the final designs.
Following our analysis, we will share a summary of what we heard and explain how the feedback informed the final playground designs.
The playground upgrades are fully funded by Barwon Coast through revenue generated by our caravan parks.
Revenue from the caravan parks is reinvested into the parks and the coastal reserves managed by Barwon Coast.
Timelines are indicative and may change due to approvals, procurement, weather and site conditions.
The existing playgrounds have reached the end of their useful life and require updating to meet modern safety, accessibility and operational standards.
Their replacement is identified as a priority in the Barwon Coast Caravan and Camping Parks Master Plan, which was finalised in 2023 following camper, community and stakeholder consultation.
The project includes the three play spaces within Barwon Heads Caravan Park:
The playground near the netball and tennis courts is planned to be delivered in late 2026, followed by the T4 playground in late 2027.

The play spaces surrounding the netball and tennis courts will be delivered in stages.
The second playground, co-located with amenities block T4, is expected to be delivered in late 2027.
Delivering the projects in stages allows Barwon Coast to coordinate works, make the most of the investment already occurring within the precinct and progressively create more connected, welcoming and functional spaces for families, park guests, sporting clubs and the wider community.
Construction is already underway in this area as part of the football and netball facilities redevelopment.
Coordinating the playground upgrade with this project will help minimise impacts on guests, avoid returning to the same area for another major construction period and make efficient use of the investment already occurring in the precinct.
We sought feedback about the proposed playground designs, including:
– preferred play equipment and activities
– the suitability of the proposed layout
– opportunities for inclusive and accessible play
– seating and supporting facilities
– landscaping and connections with surrounding areas
– features that may be missing or could be improved.
The consultation is focused on refining the designs rather than whether the existing playgrounds should be replaced, as their replacement is already included in the adopted Caravan and Camping Parks Master Plan.
It may not be possible to incorporate every suggestion.
Feedback will be considered alongside safety, accessibility, technical, operational, space, timing and budget requirements. We will share how the feedback influenced the final designs when the consultation findings are released.
Accessibility and inclusive play will be considered as part of the design process.
The final designs will also need to comply with relevant playground safety and accessibility requirements and respond to the conditions and available space at each site.
Yes! We have already updated the playgrounds at Riverview Family Caravan Park and Breamlea Caravan Park – click through to have a look at them; some images have been included below for your information.


The proposed design includes the closure of a short section of the internal park road to create a larger, safer and more functional play space.
Closing this section of road would reduce vehicle movements immediately adjacent to the playground, improving safety for children and families. It would also allow the play space to expand, providing more room for play equipment, paths, seating, landscaping and places for families to gather.
We recognise this proposal may have implications for a small number of nearby Temporary Permit Holder (TMP) sites. Barwon Coast is consulting directly with the affected permit holders discuss the proposal as part of the design process.
The designs will allow for cultural signage or interpretation to be added in the near future.
Any cultural content would be developed in collaboration with Wadawurrung Traditional Owners to respectfully share stories of Country and strengthen visitors’ connection to place.
The play space surrounding the netball and tennis courts will be delivered in stages.
The second playground, co-located with amenities block T4, is expected to be delivered in late 2027
Timing remains subject to the completion of design work, relevant approvals, procurement, weather and site conditions.
Some construction noise, machinery and temporary access changes may occur while the playground works are underway.
Coordinating the first playground upgrade with the football and netball redevelopment will help avoid a separate period of major construction activity in the same area.
Guests and permit holders will be provided with further information before works begin.
Project updates will be published on the Barwon Coast website and social media channels.
You can also subscribe to the Barwon Coast newsletter to receive updates about this and other projects.
ℹ️ Service disruption – Microsoft outage
Barwon Coast is currently experiencing some system disruptions due to the global Microsoft issue, which may affect our ability to respond to enquiries as quickly as usual.
If your enquiry is urgent, please give us a call on (03) 5254 1118.
Thanks for your patience and understanding. We`ll keep you updated and let you know when we are back to normal.
A little kindness goes a long way.
This World Kindness Day, we`re encouraging everyone in our coastal communities to show kindness to one another, to our environment and to the people who care for it.
Our Barwon Coast team works hard, and with heart, every day to care for the coast we all love. Whether they`re maintaining our beaches and facilities, protecting our natural environment or helping visitors enjoy their time on the coast, they do so with pride and dedication.
We ask our community to extend the same care and respect to our staff that they show to our coastline.
A friendly smile, a kind word or a simple thank you can make someone`s day. Be kind to each other. Be kind to our staff. Be kind to our coast. 💙
The coastal skies can be so much more interesting than just clear blue (although we do love a sunny day on the coast!). This pic by one of our clever staff members gives yet another new perspective on the Bluff, sea and skies 🤩 What a magical place to live, work or visit - we are so lucky.
A little chick, with a watchful parent close by! 🐣
Filmed on Monday at Barwon Bluff, this Hooded Plover chick is one of three that hatched last week. All three chicks were last sighted yesterday and are still going strong!
A big thank you to Friends of the Hooded Plover Bellarine for their incredible work monitoring these vulnerable birds and for sharing this precious footage with us.
Please continue to respect beach closures and follow signed detours to give these little ones the best chance of survival.
🚧 Temporary beach access closure – Thirteenth Beach
The car park and beach access path at Thirteenth Beach sand ramp beach access (Emergency Marker THI182, formerly 40W) will be temporarily closed on Friday 13 November 2026 for essential track surface repairs.
Works are expected to take one day.
Thanks for your patience while we complete these important maintenance works to keep our coastal access tracks safe.
"They shall grow not old, as we that are left grow old:
Age shall not weary them, nor the years condemn.
At the going down of the sun and in the morning
We will remember them."
– Laurence Binyon, For the Fallen
Today, we honour those who have served and sacrificed in times of war, conflict and peacekeeping.
We also acknowledge the service and sacrifice of Aboriginal and Torres Strait Islander peoples who have served in defence of our country and the freedoms we enjoy today.
At 11 am, we join Australians across the country in observing one minute`s silence to remember all who have served and sacrificed.
Lest we forget. 🌺
💙 Hooded Plover update – Three chicks and a new nest!
Some positive news from our coast today (9 November)!
🐣 Barwon Bluff South: All three chicks are now five days old and were spotted foraging on the intertidal reef this morning.
🥚 Thirteenth Beach at Boings: A new nest has been discovered with three eggs!
How you can help:
💙 Do not enter the closed section of beach between The Bluff Dune South and The Hole beach accesses.
💙 Follow the signed pedestrian detours.
💙 At Thirteenth Beach at Boings, keep dogs on lead and walk close to the waterline.
💙 Follow local signage and give nesting birds and chicks plenty of space.
Thank you for helping give these vulnerable shorebirds the best chance of survival! And a big thank you to Friends of the Hooded Plover Bellarine for their ongoing monitoring efforts and for sharing this wonderful video with us!
Find out more, including the beach closure map, on our website news section (link in bio).
The magic of the sun rising over this beautiful stretch of coastline will never be taken for granted - at Barwon Coast, we count ourselves lucky to be tasked with caring for the coast. Do you love to catch a sunrise, or a sunset, at the beach? Where are the best vantage points? What about a sunrise swim, like the @sunrise.hunter_ group that meets every morning at Ocean Grove Main Beach all year round?
📣 Did you know you can report an issue via our website?
Whether it`s vandalism to one of the facilities we manage, a maintenance issue or something else that needs fixing, you can let us know using our online reporting form.
Our team will review your report as soon as possible and follow up where required.
💻 Report an issue via our website (link in bio)
Thanks for helping us care for our coast!
P.S. This is an old pic
💙 Three Hooded Plover chicks have hatched at Barwon Bluff South! 🐣
Three Hooded Plover chicks hatched today (5 November), marking a positive milestone in this year`s breeding season.
To protect the chicks, a temporary beach closure is being established between The Bluff Dune South and The Hole beach accesses for approximately five weeks, until the chicks can fly and are considered self-sufficient.
💙 Please respect the closure and follow local signage and barriers.
💙 Follow the signed pedestrian detour or explore one of our other beautiful local beaches while the chicks grow.
💙 Keep dogs away from the protected area and give the chicks plenty of space.
A big thank you to the Friends of the Hooded Plover – Bellarine volunteers for their ongoing efforts!
Read the full update, including the beach closure map on our news story on our website - link in bio

This is Wadawurrung Country. We acknowledge the Wadawurrung People as the Traditional Owners of the land, waters, seas and skies of Ocean Grove, Barwon Heads, 13th Beach, Black Rock and Breamlea. We honour and say Nyatne to Elders past, present and future whose ancestors, for thousands of years, have cared for this part of Dja (Country). We are committed as an organisation to meaningfully work together with Traditional Owners to make Wadawurrung Culture and Country strong.

© 2026 Barwon Coast. Website by Residency Studios.