Find out more
Contact Barwon Coast at the following
14 September 2026
Barwon Coast is recruiting at least 15 Casual Cleaning Officers to join our caravan park and campground team for the busy 2026-27 peak season.
9 September 2026
The Barwon Heads Nature Festival is back from Monday 21 to Friday 25 September
27 August 2026
A new Hooded Plvoer nest has been discovered on 13th Beach
19 August 2026
Barwon Coast is inviting the community to help shape the designs of two playgrounds at Barwon Heads Caravan Park,
6 August 2026
The final Bancoora Coastal Adaptation Plan (CAP) is now available.
Home / Recent Projects / Foreshore Master Plan
Stage 1: Community survey open 100%
Stage 2: Community and Stakeholder Design workshops 100%
Stage 3: Developing a draft Master Plan 100%
Stage 4: Draft Master Plan released for feedback 100%
Stage 5: Community Information Sessions %
Stage 6: Incorporate feedback and develop final Master Plan %
Final Master Plan released %
Published on 12 December 2024
The Barwon Coast Foreshore Master Plan (draft) sets a clear, long-term direction for one of Victoria’s most valued coastal landscapes, spanning approximately 22 kilometres of coastal Foreshore from Breamlea to Collendina.
Prepared by Barwon Coast in partnership with Hatch Design, the Master Plan establishes a forward-looking, landscape-first framework for all public coastal land under its care, including Bancoora Beach, Black Rock, Thirteenth Beach, Barwon Bluff, Barwon Heads Foreshore, Bukareeyoo, Ocean Grove Main Beach, and Collendina.
Community consultation on the Draft Barwon Coast Foreshore Master Plan was open from 1 June to 6 July, 2026, and has now closed.
Barwon Coast would like to sincerely thank everyone who took the time to engage with the Draft Plan, whether by attending a community information session, participating in a stakeholder briefing, completing the online survey or making a formal submission.
Throughout the consultation period, we received valuable feedback from community members, Traditional Owners, government agencies, local organisations and other stakeholders. We are grateful for the time, knowledge and perspectives shared, which will help strengthen the final Plan.
Barwon Coast will now review all submissions and survey responses received during the consultation period.
Feedback will be carefully considered alongside technical advice and project objectives as we refine the Draft Foreshore Master Plan. Where appropriate, changes will be made before the final Plan is presented to the Barwon Coast Committee of Management for consideration.
Once finalised, the Foreshore Master Plan will provide a strategic framework to guide the care, management and enhancement of the Barwon Coast foreshore over the next 15 years.
Thank you again to everyone who contributed to this important project. We look forward to sharing the final Foreshore Master Plan with the community later this year.
The draft Foreshore Master Plan was shaped by community voices – and grounded in evidence. A comprehensive engagement processes was undertaken:
This process committed to deep listening, capturing issues, values, memories, behaviours, and lived experience.
Thank you to everyone who shared their ideas and insights during the initial Foreshore Master Plan engagement period. This included community members, Traditional Owners, staff, Barwon Coast Committee, the Community Reference Group, and visitors. Your contributions are helping shape the future of the Barwon Coast.
To capture this input, we prepared two reports:
Four key technical documents are guiding this work:
These strategies, reports and audits are essential tools in shaping future actions. They provide evidence-based direction that supports the values and aspirations expressed by the community.
To stay up to date on this project including notification of the final Foreshore Master Plan release, please click the link below.
The Barwon Coast Foreshore Master Plan is a 15-year guide for the protection, access, improvement and long-term care of approximately 22 kilometres of coastal Crown land managed by Barwon Coast, from Breamlea to Collendina.
This is Wadawurrung Warri Dja (Sea Country). The Master Plan begins with recognition of Wadawurrung cultural authority and the continuing relationship between Wadawurrung People, land, water, coast, culture and story.
The Master Plan responds to increasing visitation and coastal vulnerability, and has been prepared to support a coordinated, values-led and Country-first approach to managing the Foreshore as a single, interconnected cultural, ecological and community landscape.
Barwon Coast worked closely with Wadawurrung Traditional Owners Aboriginal Corporation, state and local government agencies, and key stakeholders to develop a comprehensive and inclusive plan. A Community Reference Group, formed in late 2024, has helped ensure the plan reflects the needs and aspirations of the community and visitors.
The Foreshore Master Plan is a key action out of Barwon Coast’s Coastal and Marine Management Plan 2020-2025, which provides the foundation for this Master Plan.
Barwon Coast Committee of Management Inc (Barwon Coast) is delegated by the Victorian Minister for Environment to manage 22km of the coast along Victoria’s Bellarine Peninsula. This includes the beaches and foreshores of Collendina, Ocean Grove, Barwon Heads, 13th Beach, Black Rock and Breamlea. In partnership with Traditional Owners, Barwon Coast’s charter is to protect and enhance the natural environment and provide opportunities for residents and visitors to enjoy these areas.
Barwon Coast operates three caravan parks and one campground in the foreshore reserve, as well as managing various community and commercial leases and licences. All revenue raised is reinvested to care for the natural environment and to provide facilities and infrastructure along the coast for use and enjoyment by all.
‘Master Plan’ can mean different things to everyone. To determine what a Master Plan would look like for the Barwon Coast Foreshore, we worked with Traditional Owners, community members, the Community Reference Group and stakeholders to develop a shared vision for the Foreshore.
The Barwon Coast Foreshore Master Plan is a 15-year guide for the protection, access, improvement and long-term care of approximately 22 kilometres of coastal Crown land managed by Barwon Coast, from Breamlea to Collendina.
The final Foreshore Master Plan will set Barwon Coasts direction and a significant amount of its program of work for the next 15 years. It will ensure that Barwon Coast is responding to pressures like population growth, ageing infrastructure and coastal hazards (erosion and sea level rise), as well as guide investment to ensure we continue find the right balance between meeting the needs of our communities while protecting and enhancing our natural environment.
In addition, the Barwon Coast Coastal and Marine Management Plan 2020-2025 (CMMP) is due for renewal in 2026. The outcomes of this project will inform development of a new CMMP.
Barwon Coast has been working with Hatch Design to develop the Master Plan. We have worked closely with our communities and stakeholder organisations, including Wadawurrung Traditional Owners Aboriginal Corporation, Department of Energy, Environment, Climate Action (DEECA), Department of Transport and Planning, City of Greater Geelong, Barwon Water, Corangamite Catchment Management Authority and Parks Victoria.
Yes. The Camping and Caravan Parks Master Plan, which sets out Barwon Coasts accommodation needs for the next 10 years, was approved in 2023. The Foreshore Master Plan does not review the accommodation needs reviewed camping and caravan park areas in relation to public access and facilities through the Foreshore reserves. However, due to key feedback heard during our community consultation, Bukareeyoo recreational opportunities have been considered in more detail which has impacts on some camp sites.
The Master Plan is a layered document and is designed to be read in layers. It starts with the full 22 km Foreshore and gradually zooms in to precincts, key places, priority actions, design ideas and delivery steps.
This Master Plan works at three scales; we start big, then zoom in.
The Coastal Hazard Exposure Report (CHER) and Bancoora Coastal Adaptation Plan (CAP) are foundational inputs to the draft Master Plan.
As climate change intensifies, so do the impacts of sea level rise, erosion, storm surge and inundation. These are collectively named coastal hazards, and they pose a growing risk to infrastructure, access, environmental values and the long-term function of the Foreshore. These dynamic risks are central to every planning decision. The CHER defines the physical and temporal parameters of the coastline, identifying where hazards occur today and how they are projected to evolve. It provides the primary evidence base for risk-informed planning and basis for a mitigation hierarchy, found in the draft Plan, which guides how the Master Plan responds to coastal hazards.
The mitigation hierarchy follows a clear logical sequence:
1. Avoid risk where possible.
2. Adapt where change is needed.
3. Transition over time where places can no longer support the same use.
This helps ensure access, land use and infrastructure decisions work with coastal processes, reduce future risk, and support long-term resilience.
The Plan seeks to carefully manage and minimise impacts on the foreshore. Proposed improvements are intended to be balanced with environmental protection and landscape character.
The Plan uses ecological sensitivity, coastal hazard exposure, the Biodiversity Strategy 2025-35, the Mature Tree strategy and cultural values to guide where access, infrastructure and activities are appropriate or limited.
Community and stakeholder input has directly informed the direction of the draft Plan. The Community Reference Group (CRG), established through an open Expression of Interest in late 2024, brings together approximately 20 members representing local residents, landowners, sporting clubs, and conservation and community organisations. The CRG plays an ongoing role in testing ideas and shaping outcomes.
Wadawurrung Traditional Owners have contributed through workshops and direct collaboration, strengthening understanding of Country as an interconnected system of land, water, culture and story. This knowledge has informed the Shared Values, priorities and key frameworks that guide how the Foreshore is planned, experienced and cared for.
Engagement has been central to the development of the Master Plan. Between November 2024 and July 2025, sessions and engagement included:
To support a fair and transparent engagement process, any duplicate or coordinated submissions may be identified and grouped during analysis. Feedback will be assessed based on themes and issues raised, rather than the number of times identical comments are submitted.
We will also look at feedback gathered across all engagement activities – including surveys, workshops, drop-in sessions and conversations with stakeholders – rather than relying on form submissions alone.
Community members, Traditional Owners, staff, Barwon Coast Committee, the Community Reference Group, and visitors shared so many considered ideas, feedback and insights during our Foreshore Master Plan engagement – we thank everyone who took the time to get involved.
To capture and share this input, in September 2025 we released two reports:
The Plan is guided by three core priorities that arose from the community engagement:
1. Putting Country First: embedding Wadawurrung cultural authority and protecting ecological systems
2. Access as Invitation: delivering a connected, legible and safe movement network
3. Leading with Care: focusing investment, reducing impact, and retaining coastal character
Across the seven precincts, the Master Plan identifies where access should be improved, where activity should be concentrated, where informal tracks should be closed and restored, where cultural recognition and storytelling should be strengthened, and where sensitive ecological and coastal hazard areas require protection or long-term adaptation.
Governance
The Marine and Coastal Act 2018 and Marine and Coastal Policy 2020 are the key statutory and policy frameworks underpinning the Master Plan. They guide decision-making and establish the planning concepts, including the definitions of activity nodes and recreation nodes, that direct use, organise infrastructure and minimise impacts on the coastal environment (DELWP, 2020).
The Master Plan draws on a structured review of policy, legislation and supporting documents, establishing the statutory framework, strategic direction and evidence base for all planning decisions.
Policy and Legislative Framework
Statutory and Management Plans
Strategic and Regional Frameworks
Coastal and Environmental Technical Reports
Site-Specific and Precinct Plans
No. Any future works would still require relevant approvals, environmental assessments and compliance with state and local legislation and policy.
Next steps and implementation
The community was invited to review the draft Foreshore Master Plan and provide feedback between 1 June and 6 July 2026. Community feedback will help refine the Plan and guide how the coast is managed, protected and enhanced into the future.
Barwon Coast will now review all feedback received and prepare a final Foreshore Master Plan for consideration by the Barwon Coast Committee of Management and the Victorian Government.
We will share the final Foreshore Master Plan with the community.
An implementation plan will be developed which will set out priority actions (e.g. high, medium, low), costs estimates and potential funding sources. A quantity surveyor has been engaged to provide cost estimates. The implementation plan will guide Barwon Coast’s operational budgets and yearly works schedule. Actions will be implemented by Barwon Coast staff, contractors and consultants (depending on the required skills, timing and expertise).
The draft Foreshore Master Plan is a long-term guide to help shape decision-making and future investment across the coast over the next 15 years. While the Plan identifies a broad range of actions and opportunities, it is unlikely that all actions will be delivered within this timeframe.
Implementation will occur progressively and be subject to available funding, approvals, environmental assessments and changing community priorities. Funding may come from a range of sources, including Barwon Coast investment, government partnerships (Federal, State and Local), grant opportunities, private sector investment and philanthropic contributions.
The Master Plan does not approve every action for construction, guarantee funding or remove the need for further design, approvals, cultural and community engagement, environmental assessment or feasibility testing; Some will require further investigation, approvals or detailed design before implementation.
The Master Plan provides a clear decision-making framework to help Barwon Coast, Wadawurrung Traditional Owners, government agencies, partners and the community make better decisions over time.
Actions will be reviewed and adjusted over time in response to:
Project updates, including factsheets, engagement opportunities, technical reports that inform the draft Plan, and community engagement reports and summaries, will be shared on the dedicated project webpage and through Barwon Coast social media channels.
To stay up to date on the project, including being notified when the final Foreshore Master Plan is released, join our mailing list via the link below.
🌿 The Barwon Heads Nature Festival is almost here!
From 21–25 September, Friends of the Bluff are bringing together an amazing program of events celebrating the wonderful natural environment of Barwon Heads. There’s lots to explore, including some fantastic events happening across our coastal foreshore reserves:
🥾 Monday 21 September – Explore Barwon Bluff, plus two Canoe the Mangroves sessions
🌱 Tuesday 22 September – Walk on Country @ Barwon Bluff with @Wadawurrung
🌊 Wednesday 23 September – Orchids in the Park, then Land, Sea, Sky slide night
🔬 Thursday 24 September – Tide & Seek: a family ‘marine science’ day
🧤 Friday 25 September – Barwon Heads Great Spring Clean Up, followed by the Turning the Tide short film festival that evening.
There’s plenty more happening throughout the festival too!
Explore the full program and find out how to get involved: https://www.barwonbluff.com.au/nature-festival/
Congratulations to Friends of the Bluff and everyone involved in putting together another fantastic celebration of our coast. 💚
🐌 Go searching for sea slugs at Barwon Bluff!🌊
Did you know Victoria is home to more than 400 species of colourful sea slugs?
Join Parks Victoria (@parksvic ) for a Sea Slug Census in the intertidal rockpools of the Barwon Bluff Marine Sanctuary and see what you can discover.
📅 Thursday 17 September
⏰ 9.30–11.30am
📍 Barwon Bluff Marine Sanctuary
Learn more about these fascinating marine creatures while helping contribute valuable observations to the Victorian Marine Parks Association database and iNaturalist.
Registrations are essential.
Find out more and register via www.parkconnect.vic.gov.au/volunteer-activities (search for `sea slug`)
A cuppa, a chat and an important question – R U OK? 💛
Today our team came together for an R U OK?Day morning tea and heard from our Employee Assistance Program provider about the confidential health and wellbeing support available to our staff and their families.
It was a great reminder to make time for genuine conversations – today and every day.
Ask R U OK? Any day. 💛
#RUOKDay #RUOK #WorkplaceWellbeing
🥚 Hoodie nest update!
We’re pleased to share that there are currently two active Hooded Plover nests – at Blue Rocks and near Signpost at 13th Beach – each with three eggs. 🤞
Hoodies nest directly on the sand, and their tiny, camouflaged eggs can be almost impossible to spot. They’re also easily disturbed, so please give them plenty of space.
🩵 Keep close to the waterline
🩵 Keep dogs on lead near nesting areas
🩵 Stay outside fenced or roped-off areas
Six little eggs – fingers crossed we`ll see some little chicks! 🐣
#HoodedPlovers #BarwonCoastHoodieWatch
💙 Happy Father’s Day!
Wishing a very happy Father’s Day to all the wonderful fathers and father figures in our community!
If you’re looking for something fun to do with Dad today and haven’t, ahem, made a solid plan yet… why not swing by the Barwon Coast Discovery Centre in Barwon Heads? 🐚
Housed in the historic Lobster Pot, there’s plenty to explore – from local marine life and wildlife to geology, shipwrecks and local history.
🦀 Open today, 1–4pm
📍 Jetty Road, Barwon Heads
🌊 Free entry – all ages welcome
Perfect for a little Father’s Day wander by the coast.
More information: https://barwoncoast.com.au/about-the-coast/barwon-coast-discovery-centre/
Species spotlight: Sooty Oystercatchers 🖤❤️
Have you spotted a Sooty Oystercatcher along our coast?
With their striking all-black plumage, long red bill and bright red eyes, these distinctive shorebirds are amazing to spot along our coast – although their dark colour can make them tricky to see against the basalt of our coastal reefs.
📸 A big thank you to Rod Morrison for these fantastic photos!
Got a great photo of local wildlife? We’d love to see it – share it with us in the comments or send it our way.
And if you’d like to learn more about the birds you might spot around Barwon Bluff, our friends at Friends of the Bluff Barwon Heads have put together some great information.
👉 Check out their Sky – Birds page: https://www.barwonbluff.com.au/sky-birds/
A quick reminder about bird flu: If you come across sick or dead birds along the coast, please don’t touch or handle them. Keep your distance, keep dogs away and report sightings to the relevant authorities. Reports of sick and dead birds are important in helping authorities monitor for avian influenza. More info: agriculture.vic.gov.au/birdflu
🌊 The Barwon Coast Discovery Centre is back from this Sunday! 🐚
After a winter break, the doors of will be open this Sunday, and there’s plenty to discover inside.
Drop in and explore the stories of our coast – from local marine life, plants and wildlife to geology, shipwrecks and local history. You can also have a chat with one of the wonderful Friends of The Lobster Pot volunteers, who always have plenty of knowledge to share.
🦀 Open Sundays, 1–4pm
📍 Jetty Road, Barwon Heads
🌊 Free entry – all ages welcome
Come in, have a look around and discover something new about the coast .
More information: https://barwoncoast.com.au/about-the-coast/barwon-coast-discovery-centre/
#BarwonCoast #BarwonHeads #DiscoveryCentre
🌸 Hello, spring! 🐝
As we welcome a new season, we’re feeling pretty lucky to experience this special stretch of coast in all its seasons.
There’s a lot to love about a coastal winter – wild seas, moody skies, quiet beaches and those crisp, clear days. But we’re also happy to see the first signs of spring appearing across the coastal foreshore.
Coastal plants are starting to flower, warmer days are sneaking in (along with some pretty hectic rain!) and Hooded Plover breeding season is underway once again. Please keep your fingers crossed for a successful season for these vulnerable little birds. 🤞🐦
Here’s to spring on the coast – new life, changing landscapes and plenty more wild weather along the way. 🌿🌊
We have Hooded Plover nest lift-off! 🥚
We have discovered this little nest on 13th Beach (Black Rock end) and are hoping to see a little family here in around four weeks` time. Our keen-eyed staff have also noticed scrapes (Hoodies usually lay their eggs in shallow scrapes in the sand) at Stingray Bay, Breamlea, and near @13thbeachslsc - exciting!
When enjoying the coast, beachgoers are asked to help protect this nest by:
🩵 Walking close to the waterline
🩵 Keeping well clear of fenced or roped-off areas
🩵 Keeping dogs on-lead and away from sensitive dune areas
🩵 Giving the birds plenty of space so they do not abandon their eggs
Every small action helps give Hooded Plovers the best chance to hatch and thrive. Thank you for taking care on our beaches.
🏡 The final two cabins are arriving!
The last two cabins for our new cabin precinct at Barwon Heads Caravan Park are due to arrive late tonight, Tuesday 25 August.
The cabins will be parked along Jetty Road overnight before being moved into position tomorrow morning.
To allow this to happen safely, the main caravan park entrance will temporarily close for a couple of hours, with guest vehicle access redirected via the temporary Bluff Road entrance.
There may also be temporary parking restrictions and delays along Jetty Road while the cabins are manoeuvred into position.
Thanks for your patience while we get the final two cabins into place!

This is Wadawurrung Country. We acknowledge the Wadawurrung People as the Traditional Owners of the land, waters, seas and skies of Ocean Grove, Barwon Heads, 13th Beach, Black Rock and Breamlea. We honour and say Nyatne to Elders past, present and future whose ancestors, for thousands of years, have cared for this part of Dja (Country). We are committed as an organisation to meaningfully work together with Traditional Owners to make Wadawurrung Culture and Country strong.

© 2026 Barwon Coast. Website by Residency Studios.